Dummed asphalt melting equipment
Categories | Asphalt Equipment |
---|---|
Brand | IKOM |
Condition | New |
FOB port | SHANGHAI |
Terms of Payment | L/C, T/T |
Update Time | Oct 9,2024 |
Detail Information
Main Technical Description
The design of double-unit structure is adopted for Drummed Asphalt Melting Equipment, composed of the asphalt dumping main equipment unit and the heat-conducting oil boiler unit, and the form of frame structure is applied to its both main-body structures, for the strength and the stability of the units to be reliably ensured. Stainless steel corrugated pipe flexible connection is adopted for the pipeline connection between the two units, typical of simple site dismantlement and installation as well as convenient transportation, especially adaptable to installation and construction on overseas construction sites. Heat-conducting oil “S” coil pipe is mainly employed for heating of the dumping unit, and at the same time the combustion waste gas of the heat-conducting oil boiler is utilized for auxiliary heating, which has effectively improved the fuel utilization efficiency, and reduced energy consumption.
Main Technical Parameter
Model |
ZM-TT4 |
ZM-TT8 |
Total weight(t) |
16 |
18 |
Dimension of the equipment(mm) |
8000×2100×2600 |
11000×2550×2600 |
basic parameter |
||
productivity(t/h) | 3~4 | 8 |
No. Barrels(Barrel/set) | 20 | 36 |
capacity of bitumen(m3) | 12 | |
the temperature of bitumen(℃) | 130-160 | |
asphalt pump(m3/h) | 27 | |
Max. Trolley Working speed(m/min) | 10.4 | 11.45 |
heating system | ||
capacity of condution oil (kw) | 470 | 720 |
Dimension(mm) | 6000×2200×2600 | 5700×2300×2300 |
power supply system | ||
total power of electricla(kw) | <30 |
Product pictures
productivity(t/h):3-4
productivity(t/h):8
With boiler
Loading
Review
- Loading...
Please send your message to us
- Name
- *Tel
- *Title
- *Content